Which Concrete mix information to be supplied by the Purchaser as per IS code??

 IS code เค•े เค…เคจुเคธाเคฐ Ready mix Concrete supplier เค•ो เค•ौเคจ เค•ौเคจ เคธी เคœाเคจเค•ाเคฐी Ready mix concrete เค•े เคฒिเค เค•ांเคŸ्เคฐेเค•्เคŸเคฐ เค•ो เคฆेเคจी เคšाเคนिเค। as per IS Code 4926: 2003 

Or Which Concrete mix information to be supplied by the Purchaser?

เค•िเคธी เคญी เค•ंเค•्เคฐीเคŸ เคฎिเค•्เคธ เคธเคช्เคฒाเคฏเคฐ เค•ो เค•ंเค•्เคฐीเคŸ เคฎिเค•्เคธ เค•े เคฒिเค  เคจिเคฎ्เคจ เคœाเคจเค•ाเคฐी เค•ंเค•्เคฐीเคŸ เคฒेเคจे เคตाเคฒे เคธे เคฒी เคœाเคจी เคšाเคนिเค as per IS Code 4926: 2003


ANNEX D เค•े(Clauses 7.2 and 7.3.1) เค•े  เค…เคจुเคธाเคฐ 

1. RMC:......

2. Contractor:.........

3. Site......

4.Grade (N/mm²) (Characteristic strength).......

5. Minimum Cement Content (kg/m³)........

6. Mineral Additives (Pulverized fuel ash/Slag/Others) (kg/m³)........

7. Maximum Free Water-Cement Ratio.........

8. Nominal Maximum Aggregate Size.......

9. Cement Type and Grade (if preferred)........

10. Target Workability [Slump(mm)].......

11. Target Workability at Site.........

12. Maximum Temperature of Concrete at the Time of Placing........

13. Class of Sulphate Resistance (if applicable)........

14. Exposure Condition (if applicable)........

15. Class of Finish (if applicable)........

16. Mix Application........

17. Method of Placing........

18. Any Other Requirements (Early strength workability retention, permeability testing, chloride content restriction, maximum cement content, etc).........

19. Concrete Testing (Frequency)......

20.Material's Testing (any non- routine requirements)......

21. Alternatives to be Offered: YES/NO........

22. Method of Curing to be Used by Contractor.......

23. Quantity(m³)........



Note: เค•िเคธी เค…เคจ्เคฏ เค…เคฅเคตा เค…เคงिเค• เคœाเคจเค•ाเคฐी เค•े เคฒिเค เค•िเคธी เคฆूเคธเคฐे เคช्เคฐोเคซाเคฐ्เคฎा เค•ा เคช्เคฐเคฏोเค— เค•िเคฏा เคœा เคธเค•เคคा เคนै।